INSP-Final Inspection | 12/19/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete, outlet shutdown for VR system verified during active fire alarm.
Luke Phone #: ###-####
|
INSP-Alarm Testing | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | CANC |
Jim Page
|
|
|
Per luke should be for a final Luke Phone #: ###-####
|
Issue and Print Permit | | | 12/2/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/26/2019 | | PASS |
|
|
|
|
1st review completed | | | 11/26/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 11/26/2019 | | 11/26/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/26/2019 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 11/26/2019 | | DONE |
|
|
|
met
|
Application received | | | 11/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 25 2019 8:39AM
|
Plan assigned to (Lee) | 11/25/2019 | | 11/25/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 11/25/2019 | | FAIL |
|
|
|
Applicant requested the drawings be returned for corrections.Other corrections are also required, as noted on the drawing.
|