INSP-Final Inspection | 8/11/2020 | 8/13/2020 | 8/13/2020 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, inspection request will be rescheduled for a later date.
I will be calling in 4 of these final elevator inspections let me know if this is too much we will have the elevator company here to get us into the shaft and pit to test devices Phone #: ###-#### Inspection requested via web by Trevor Reed
|
Fees Due Hold | 1/9/2020 | | 6/12/2020 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 12/9/2019 | | 12/9/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 12/9/2019 | | PASS |
|
|
|
|
1st review completed | | | 12/9/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/9/2019 | | 12/9/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/9/2019 | | DONE |
|
|
|
Quick permit passed, as noted on the operational matrix.
|
Permit Ready to Issue | | | 12/9/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/9/2019 | | DONE |
|
|
|
Micron permit
|
Application received | | | 12/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2019 3:47PM
|