INSP-Final Inspection | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Mary resubmitted to Lee as-builds and the As-built set is on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 1/20/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Troy Cobbley
|
|
|
Plan mods are needed to show the 30cd strobe. Need city approved plans on site as well.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
Plan resubmittals received | | | 1/23/2020 | | DONE |
|
|
|
Per Marry with Absolute. As built
|
Plan assigned to (Lee) | 1/23/2020 | | 1/23/2020 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/23/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 1/23/2020 | | 1/23/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/23/2020 | | DONE |
|
|
|
As built - No Fee
|
Permit Ready to Issue | | | 1/23/2020 | | DONE |
|
|
|
as built met
|
CHANGE STATUS TO (ISS) | | | 1/23/2020 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/17/2020 | 1/23/2020 | 1/20/2020 | A | CANC |
Troy Cobbley
|
|
|
Needs to be done at 7:30am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
Issue and Print Permit | | | 12/30/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/30/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 12/26/2019 | | 12/26/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 12/26/2019 | | PASS |
|
|
|
|
1st review completed | | | 12/26/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/26/2019 | | 12/26/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/26/2019 | | DONE |
|
|
|
Quick permit passed. No comments.
|
Permit Ready to Issue | | | 12/26/2019 | | DONE |
|
|
|
met
|
Application received | | | 12/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2019 1:27PM
|