INSP-Final Inspection | 3/13/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 3/11/2020 | 3/16/2020 | 3/13/2020 | A | CANC |
Troy Cobbley
|
|
|
Needs to be done at 7:00am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Final Inspection | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Troy Cobbley
|
|
|
The sprinkler work in the Gym area is complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, scope of work is approved for cover, on-site approved drawings have been notated areas approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Intake Approval | | | 12/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 12/24/2019 | | 12/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 12/24/2019 | | 12/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 12/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/24/2019 | | DONE |
|
|
|
MET
|
Issue and Print Permit | | | 12/24/2019 | | DONE |
|
|
|
|
Application received | | | 12/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 23 2019 3:36PM
|