INSP-Final Inspection | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Todd has drawings Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Sprinkler Plan Check | 1/30/2020 | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/30/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/27/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/27/2020 | | 1/27/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 1/27/2020 | | DONE |
Mark Stumbaugh
|
|
|
Emailed Sam asking for a haz mat sheet to be filled out listing all hazardous materials being stored.
|
Application received | | | 1/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 10 2020 1:03PM
|