INSP-Final Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Jim Page
|
|
|
Hydrostatic test has been witnessed, no pressure loss observed at riser provided gauge.
Hydro only, call James before heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Troy Cobbley
|
|
|
The overhead rough-in passed. Tenting verified. Piping is of for cover. Rough and tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 1/21/2020 | | DONE |
|
|
|
|
Application received | | | 1/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2020 7:32AM
|
Intake Approval | | | 1/16/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/16/2020 | | 1/16/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/16/2020 | | 1/16/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 1/16/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/16/2020 | | DONE |
|
|
|
met
|