Permit Information
Permit NumberFIR20-00047
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 555 W PARKCENTER BLVD
Project NameDELTA DENTAL OF IDAHO
Customer Number 
ePlanReviewYes
Description
SHILO WILL INSTALL A 6" UNDERGROUND TO TWO BUILDINGS. THE FIRST BUILDING IS EXISTING AND THE SECOND BUILDING IS NEW. BOTH BUILDINGS WILL HAVE FULL FIRE PROTECTION ACCORDING TO NFPA 13. BOTH BUILDINGS ARE OF COMBUSTIBLE CONSTRUCTION AND HAVE UPRIGHTS AND CONCEALED SPACE SPRINKLERS SPACED THROUGHOUT THE ATTIC SPACE. PENDENT SPRINKLERS SHALL BE SPACED ACCORDING TO WALLS AND CEILINGS.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/2/20207/2/20207/2/2020PPART
DetailsJim Page
Final fire sprinkler inspection for TCO phase 1 complete.

Richard Clark is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection6/30/20207/1/20207/1/2020PCANC
DetailsTroy Cobbley
Not ready for final. Richard Clark is the contact. Thanks! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/30/20207/1/20207/1/2020ACANC
DetailsTroy Cobbley
Per Richard this inspection is not needed. Intent was for turning on underground water supply.

underground_Richard *screend* Phone #: ###-####
INSP-Final Inspection6/30/20207/1/20206/30/2020ACANC
DetailsJim Page
Richard Clark is the contact. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in6/19/20206/22/20206/22/2020AFAIL
DetailsJim Page
Upright coverage in Board Room around partition wall is overspaved, partition wall framing goes all the wat too deck, correct uprigh coverage issue. Office B131 has upright overspacing issues, correct spacing to be compliant with NFPA13. Fire sprinkler head in east main entry is painted, replace painted head. Pendant heads in northeast main entry area with be hit by cabinet dooes in current locaiton, sprinkler heads in front of cabinets will need to be relocated, inspection stopped, a full rough in with exception to hardlids will need to be completed.

Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/29/20204/30/20204/30/2020PCANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, point of contact noticed overspacing issues with walls that go to the deck causing upright coverage issues, inspection will be rescheduled for a later date.

Richard Clark is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
CHANGE STATUS TO (ISS)  3/13/2020 DONE
Sprinkler Plan Check3/11/2020 3/12/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/12/2020 DONE
DetailsMark Stumbaugh
Review time 2 hrs
No new devices
Permit Ready to Issue  3/12/2020 DONE
plan mod approved
Plan assigned to (Stumbaugh)3/10/2020 3/11/2020 DONE
DetailsMark Stumbaugh
plan mod #1- using flex drops to the heads, new plans and calcs
Plan Modification Accepted  3/10/2020 DONE
plan mod #1
Plan resubmittals received  2/12/2020 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check2/12/2020 2/12/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/12/2020 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  2/12/2020 DONE
Issue and Print Permit  2/12/2020 DONE
Sprinkler Plan Check1/27/2020 2/6/2020 FAIL
DetailsMark Stumbaugh
1st review completed  2/6/2020 FAIL
DetailsMark Stumbaugh
Application received  1/27/2020 DONE
Application submitted via PDS Online on Jan 27 2020 9:41AM
Intake Approval  1/27/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/27/2020 1/27/2020 DONE
DetailsMark Stumbaugh