INSP-Final Inspection | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Plan review is ok with two pendants from a 1" outlet.Payton Nelson Phone #: ###-####
|
Issue and Print Permit | | | 2/13/2020 | | DONE |
|
|
|
|
Intake Approval | | | 2/12/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/12/2020 | | 2/12/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/12/2020 | | 2/12/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/12/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/12/2020 | | DONE |
|
|
|
met
|
Intake Approval | | | 1/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit to be issued
|
Application received | | | 1/28/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2020 9:30AM
|