CHANGE STATUS TO (ISS) | | | 4/2/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/27/2020 | | DONE |
|
|
|
Nate requested the work flow to be opened for a plan mod
|
Plan assigned to (Stumbaugh) | 3/27/2020 | | 3/27/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 3/27/2020 | | 3/27/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2020 | | DONE |
Mark Stumbaugh
|
|
|
1 hr review time
No new devices
|
Permit Ready to Issue | | | 3/27/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete, freeze protection is in place, composite wood joist have been filled with expanding foam insulation for freeze protection, tenting not required for this application. Cover is approved at contractors discretion contingent upon the as-builts being approved for install.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 2/5/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
met
|
Sprinkler Plan Check | 1/30/2020 | | 1/31/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 1/31/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/30/2020 | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/28/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2020 1:06PM
|