INSP-Final Inspection | 2/5/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Chris, Please call 30 min before hand, will be coming from Nampa Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 2/5/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed.
|
Plan resubmittals received | | | 2/7/2020 | | DONE |
|
|
|
Chris with Viking automatic sprinkler calling in for As builts
|
Plan assigned to (Stumbaugh) | 2/7/2020 | | 2/7/2020 | | DONE |
Mark Stumbaugh
|
|
|
as builts
|
Sprinkler Plan Check | 2/7/2020 | | 2/7/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2020 | | DONE |
Mark Stumbaugh
|
|
|
As built drawings no review required
No fee
no new devices
|
Permit Ready to Issue | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
Issue and Print Permit | | | 2/4/2020 | | DONE |
|
|
|
|
Application received | | | 2/3/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 3 2020 10:20AM
|
Intake Approval | | | 2/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/3/2020 | | 2/3/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/3/2020 | | 2/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
met
|