INSP-Final Inspection | 6/24/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Inspection performed by Greg. Kc Strykowski, Tech Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 6/4/2020 | 6/8/2020 | 6/8/2020 | P | FAIL |
Troy Cobbley
|
|
|
The smoke detectors need to be centered on the doors as per NFPA 72 (door release). Also care needs to be taken on the air grill as discussed. No testing performed.
Kc Strykowski, Tech Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 6/3/2020 | 6/4/2020 | 6/4/2020 | P | CANC |
Troy Cobbley
|
|
|
screened - Josh, call for access Phone #: ###-####
|
Plan assigned to (Lee) | 2/27/2020 | | 2/27/2020 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 2/27/2020 | | PASS |
|
|
|
|
1st review completed | | | 2/27/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 2/27/2020 | | 2/27/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/27/2020 | | DONE |
|
|
|
Quick permit passed. No review comments.
|
Permit Ready to Issue | | | 2/27/2020 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/27/2020 | | DONE |
|
|
|
|
Application received | | | 2/26/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 26 2020 3:37PM
|