CHANGE STATUS TO (ISS) | | | 8/13/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 7/31/2020 | | 8/10/2020 | | DONE |
Lee G Meredith
|
|
|
as built
|
Intake Approval | | | 8/10/2020 | | PASS |
|
|
|
|
1st review completed | | | 8/10/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 8/10/2020 | | 8/10/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/10/2020 | | DONE |
|
|
|
As built - no fee.
|
Permit Ready to Issue | | | 8/10/2020 | | DONE |
|
|
|
as built approved
DO NOT RE ISSUE
|
INSP-Final Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 | A | PART |
Troy Cobbley
|
|
|
Temp for fire alarm until the plan mods are approved and verified.
|
Plan resubmittals received | | | 7/31/2020 | | DONE |
|
|
|
Jack from Alarm System requested an as built workflow started
|
INSP-Alarm Testing | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where devices are overspace, non-functional and mounted too high. Also the notification devies do not sync audibly. It appears plan mods are required.
To be performed in conjunction with Fire Sprinkler ; Life Safety inspections Phone #: ###-#### Inspection requested via web by Jack Schmidt
|
Issue and Print Permit | | | 3/3/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/2/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/2/2020 | | 3/2/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/2/2020 | | DONE |
|
|
|
Resubmittal passed with review comments.
|
Permit Ready to Issue | | | 3/2/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 2/28/2020 | | 2/28/2020 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 2/28/2020 | | PASS |
|
|
|
|
1st review completed | | | 2/28/2020 | | FAIL |
|
|
|
See 1st review comments.
|
Application received | | | 2/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2020 3:11PM
|