INSP-Final Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Please call Jeff with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, inspection request will be rescheduled for a later date.
RICK FRY IS OUR CONTACT. G.C. WANTS TO DO THIS AT THE SAME TIME AS THE ALARM CONTRACTOR IS DOING HIS THIS AFTERNOON. Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
CHANGE STATUS TO (ISS) | | | 4/17/2020 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Please contact Kerry for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
Plan resubmittals received | | | 4/16/2020 | | DONE |
|
|
|
Daniel from treasure valley requested an as built work flow started.
|
Plan assigned to (Stumbaugh) | 4/16/2020 | | 4/16/2020 | | DONE |
Gemma Flores
|
|
|
as built
|
Sprinkler Plan Check | 4/16/2020 | | 4/16/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2020 | | DONE |
Mark Stumbaugh
|
|
|
As Built Drawings
|
Permit Ready to Issue | | | 4/16/2020 | | DONE |
|
|
|
as built
|
INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for four pendants/piping that are ok for cover at the new wall in lobby area. Please contact Troy Nelson for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
Issue and Print Permit | | | 3/11/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/10/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 3/10/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/10/2020 | | 3/10/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/10/2020 | | 3/10/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/10/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/10/2020 | | DONE |
|
|
|
met
|
Application received | | | 3/6/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2020 1:07PM
|