INSP-Final Inspection | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Jim Page
|
|
|
Partial final inspection is complete, piping is installed per approved drawings, need to verify that head guards installed are compatible with the extended coverage sidewall sprinklers, detail on head guard literature does not specify use with sidewall sprinkler.
Todd Phone #: ###-####
|
Issue and Print Permit | | | 3/13/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2020 | | DONE |
|
|
|
met
|
Application received | | | 3/9/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2020 10:30AM
|
Intake Approval | | | 3/9/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/9/2020 | | 3/9/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/9/2020 | | 3/9/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/9/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2020 | | DONE |
Mark Stumbaugh
|
|
|
No associated BLD permit is found
|