INSP-Final Inspection | 7/6/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete. All tenting in place a time of inspection, 2 minor corrections for tenting was completed by point of contact at time of inspection, cover is approved.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Permit Ready to Issue | | | 3/19/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/19/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/19/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/18/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/18/2020 | | 3/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/18/2020 | | 3/18/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/18/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 3/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2020 8:59AM
|