INSP-Final Inspection | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | FAIL |
Troy Cobbley
|
|
|
No testing performed. Need city approved drawings and small documents. Need verification the interconnecting wire can be installed exposed between the FACP and the dialer.
Call Cameron Stone before to meet onsite Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
Intake Approval | | | 3/17/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/17/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/17/2020 | | 3/17/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/17/2020 | | DONE |
|
|
|
Quick permit passed. No review comments.
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/17/2020 | | DONE |
|
|
|
|
Application received | | | 3/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2020 3:43PM
|