INSP-Final Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
All piping is exposed, rough to cover not required, final fire sprinkler inspection for scope of work is complete.
Call Steve Johnson @###-#### for escort Phone #: ###-#### Inspection requested via web by Steve Johnson
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2020 | 3/26/2020 | 3/26/2020 | A | DONE |
Jim Page
|
|
|
24 hour air test and hydrostatic test have been witnessed, no pressure loss was observed.
|
Permit Ready to Issue | | | 3/20/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/20/2020 | | DONE |
|
|
|
|
Application received | | | 3/19/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2020 9:57AM
|
Intake Approval | | | 3/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/19/2020 | | 3/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/19/2020 | | 3/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|