INSP-Final Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Greg Ruxton
|
|
|
Flow switch previously noted as being nonworking was tested and verifed to be operational and reporting.
Flow switch has been fixed and tested
Anytime after 9am please Phone #: ###-#### Inspection requested via web by Matt Casey
|
INSP-Final Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | FAIL |
Troy Cobbley
|
|
|
South flow switch did not fuction. Greg performed inspection.
Anytime after 230pm please Phone #: ###-#### Inspection requested via web by Matt Casey
|
Issue and Print Permit | | | 4/29/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/24/2020 | | 4/24/2020 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 4/24/2020 | | PASS |
|
|
|
|
1st review completed | | | 4/24/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 4/24/2020 | | 4/24/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/24/2020 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 4/24/2020 | | DONE |
|
|
|
MET
|
Application received | | | 4/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2020 8:05PM
|