INSP-Final Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
We would like to perform this with other inspections on site this am. GC will be available for access please call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 5/8/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for scope of work is complete, cover is approved.
Would like to perform with other inspections at the site this am. GC will be available for access. Call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
Issue and Print Permit | | | 5/4/2020 | | DONE |
|
|
|
|
Application received | | | 5/1/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2020 11:08AM
|
Intake Approval | | | 5/1/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/1/2020 | | 5/1/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/1/2020 | | 5/1/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 5/1/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/1/2020 | | DONE |
|
|
|
met
|