Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR20-00318
StatusIssued
Name TRIBAL FIRE SYSTEMS
Site Address 700 S CLEARWATER LN
Project NameMarvell Clearwater TI
Customer Number 
ePlanReviewYes
Description
***QUICK PERMIT*** Install fire sprinkler underground
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Supply line flush6/29/20206/30/20206/30/2020APASS
DetailsTroy Cobbley
The underground supply line flush witnessed by Greg.

Please call Jonathan Phone #: ###-#### Inspection requested via web by Jessia McLain
INSP-Supply line flush6/29/20206/29/20206/29/2020PCANC
DetailsTroy Cobbley
Please call Jonathan Phone #: ###-#### >> Inspection requested via web by Jessia McLain Inspection cancelled from web by: Jessia McLain
INSP-Sprinkler Rough-in5/15/20205/15/20205/15/2020PPASS
DetailsJim Page
Protective coating has been applied to restraint rods, all underground supply line approved for cover.
INSP-Sprinkler Rough-in5/14/20205/15/20205/15/2020APART
DetailsJim Page
Rough to cover inspection for exterior underground piping complete, approved for cover. Plans need to updated showing C900 pipe for riser instead of IBR. Restraint rods need protective coating applied to whole sections of restraint rods, during inspection only about 1/3 of restraint rods had protective coating applied, point of contact was sent message about protective coating but as of this entry no response has been received. Exterior pipe is approved for cover, interior riser cannot be covered until protective coating has been applied and verified.

Exterior 2nd half of the rough in on the under ground to cover. Please call Chris Ford. Phone #: ###-#### Inspection requested via web by Jessia McLain
INSP-Sprinkler Rough-in5/13/20205/14/20205/14/2020APART
DetailsJim Page
Partial rough to cover inspection for underground supply from road box to change of direction complete, area inspected approved for cover, remaining underground to be inspected at a later date.

partial rough in on underground to cover.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia McLain
(F) Reprint permit  5/7/2020 DONE
Permit Ready to Issue  5/5/2020 DONE
Issue and Print Permit  5/5/2020 DONE
Application received  5/4/2020 DONE
Application submitted via PDS Online on May 4 2020 8:24AM
Intake Approval  5/4/2020 FAIL
DetailsMark Stumbaugh
Intake Approval  5/4/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/4/2020 5/4/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/4/2020 5/4/2020 PASS
DetailsMark Stumbaugh
1st review completed  5/4/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/4/2020 DONE
DetailsMark Stumbaugh