INSP-Sprinkler Rough-in/Hydro | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Overhead hydro witnessed with no pressure loss. No piping can be covered until a tenting inspection has been passed. Pump not installed yet and not inspected.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Sprinkler Plan Check | 5/26/2020 | | 5/27/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 5/27/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/27/2020 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/27/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/26/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/26/2020 | | 5/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 5/20/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2020 11:04AM
|