Telephone call | | | 8/12/2020 | | DONE |
|
|
|
accidentally started a plan mod in ePlan on this case instead of FIR20-00265. I"ve closed out the plan mod.
|
INSP-Sprinkler Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Pendants need to be added to cooler and clean room when they have been installed.
Please call Clarence before heading out.to the job.
Thank you Phone #: ###-#### Inspection requested via web by Jessia McLain
|
Issue and Print Permit | | | 6/22/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/9/2020 | | 6/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/17/2020 | | DONE |
|
|
|
met
|
Intake Approval | | | 6/9/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/9/2020 | | 6/9/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 6/2/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Waiting for BLD20-01299 to be issued.
|
Intake Approval | | | 5/26/2020 | | FAIL |
Mark Stumbaugh
|
|
|
No trade permits can be issued until a building permit is issued.
Resubmit once BLD20-01299 is issued.
|
Application received | | | 5/22/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 22 2020 6:24PM
|