INSP-Final Inspection | 7/8/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Gabe Torres is the contact. Thanks!! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/8/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed.
Gabe Torres is the contact. Thanks so much! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | FAIL |
Jim Page
|
|
|
Dry pendants are installed on couplings, literature shows dry pendants to be installed in T's, not couplings.
Gabe Torres is the contact. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 6/8/2020 | | DONE |
|
|
|
|
Application received | | | 6/4/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 4 2020 9:31AM
|
Intake Approval | | | 6/4/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/4/2020 | | 6/4/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/4/2020 | | 6/4/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 6/4/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/4/2020 | | DONE |
|
|
|
|