INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | FAIL |
Jim Page
|
|
|
Insulation/insulation barrier has been detached from numerous areas, barrier is resting/blocking upright heads throughout tenant space, insulation/insulation barrier needs to be repaired. Provide down grade to flexible dry pendants as shown in installation instructions.
TI Rough-in; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
Issue and Print Permit | | | 6/22/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/19/2020 | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/19/2020 | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/19/2020 | | DONE |
|
|
|
MET
|
Application received | | | 6/18/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 18 2020 10:54AM
|