INSP-Sprinkler Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead piping to the new drops passed rough-in inspection. An additional inspection will be required when the grid and clouds have been installed.
Please contact Rick Fry for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
Issue and Print Permit | | | 6/22/2020 | | DONE |
|
|
|
|
Application received | | | 6/19/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2020 7:07AM
|
Intake Approval | | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/19/2020 | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/19/2020 | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/19/2020 | | DONE |
|
|
|
|