INSP-Final Inspection | 7/7/2020 | 7/10/2020 | 7/10/2020 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was supposed to be for a rough-in. Need city approved drawings for inspection. I discussed the need for protection to be modified on both sides of the new wall and all ceilings re-installed.
SCREENED // Paul Phone #: ###-####
|
Permit Ready to Issue | | | 7/6/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 7/6/2020 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/2/2020 | | 7/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/2/2020 | | 7/2/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 7/2/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 7/1/2020 | | FAIL |
Mark Stumbaugh
|
|
|
License shows inactive on State web site
|
Intake Approval | | | 6/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Application received | | | 6/26/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2020 2:37PM
|