Intake Approval | | | 4/1/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/1/2016 | | 4/1/2016 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan Modification Accepted | | | 4/1/2016 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | CANC |
Thomas Walsh
|
|
|
Testing - Schmidt
|
INSP-Sprinkler Rough-in/Hydro | 4/23/2015 | 4/23/2015 | 4/24/2015 | A | PASS |
Katie Marron
|
|
|
|
Issue permit | | | 11/12/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Plan assigned to (Tim) | 4/12/2013 | | 4/12/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/6/2012 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 4/24/2015 | 4/24/2015 | | A | |
Alexandra L. DeYoung
|
|
|
|
INSP-Conference | 4/24/2015 | 4/24/2015 | | P | |
Alexandra L. DeYoung
|
|
|
|