INSP-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/26/2001 3:46:24 PM
|
DOC - Permit Finaled | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Tawney
|
|
|
Finaled by inspector at 9/26/2001 3:46:31 PM
|
INSP-Final Inspection | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | PART |
Joe Tawney
|
|
|
###-#### reinsp ok for temporary occupancy pending resolution of FDC 8/1/00 4:55:46 PM
|
INSP-Final Inspection | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | FAIL |
Joe Tawney
|
|
|
Jim ###-#### Reinsp. fail audible alarm 7/26/00 10:47:16 AM
|
INSP-Sprinkler Rough-in/Hydro | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | PART |
Joe Tawney
|
|
|
Matt ###-#### ok hydro test alarm fail could not hear thru out bldg 6/29/00 10:10:45 AM
|
INSP-Sprinkler Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Ok spklr R/I. relocate several heads. Bld99-01784. 4/26/00 11:12:50 AM
|
Inspection Record Card- Bld | 11/2/1999 | 11/2/1999 | 11/2/1999 | | DONE |
|
|
|
|
Telephone call | | | 11/2/1999 | | DONE |
|
|
|
###-#### Brad Kilburn. Called permit ready and fees due.
|
Issue permit | | | 11/2/1999 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/1/1999 | | 11/2/1999 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/2/1999 | | DONE |
|
|
|
Taken to front desk.
|
Fire Sprinkler Plan Check | | | 10/21/1999 | | FAIL |
|
|
|
Need FDC, underground identified, meter verified and other code difficiencies.
|
Application received | | | 10/15/1999 | | PASS |
|
|
|
|