Permit Information
Permit NumberFIR99-00669
StatusFinaled
Name GRINNELL FIRE PROTECTION
Site Address 205 N 10TH ST
Project NameSPR EMPIRE BLDG-SHELL
Customer Number 
ePlanReviewNo
Description
(THE EMPIRE BUILDING) This building will be fire sprinkered under the provisions of the 1994 UCBC to allow it to be 2 stories and 26 feet too tall. To upgrade an existing building to comply with NFPA 13, 1996. The structure is including a new full height 2-hr noncombustible stair enclosure, modifications to the existing full height stairway, masonry shear walls in the basement, concrete moment frames on the first floor at the South and East exterior walls, masonry pillars in the basement to support the first floor concrete moment frames, floor/roof infills on the 4th, 5th, and 6th floors, wall infills at the West wall, a modified bitumen roof membrane, a Class I standpipe system, and a new mechanical well on the roof all per approved drawings, engineering, and plan review conditions on file. A demo permit was issued earlier. The fire sprinkler system to comply with NFPA 13-1996 as regulated by the Fire Department. PC-685-99 DRH99-0163/DRH99-0164 **JWA**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/7/200112/7/200112/7/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 12/7/2001 3:32:20 PM
INSP-Sprinkler Rough-in/Hydro3/13/20013/14/20013/14/2001PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/13/2001 at 10:32:53. Contact: ###-####. see permit number FIR00-00123 for correct permit 3/14/2001 2:57:18 PM
INSP-Sprinkler Rough-in/Hydro11/16/200011/16/200011/16/2000PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 11/16/2000 4:00:25 PM ///not complete 11/16/2000 4:00:53 PM
INSP-Sprinkler Rough-in9/18/20009/21/20009/21/2000APART
DetailsRick Jackson
###-#### tested the fire pump; 500 gpm pump tested at 150, 100 percent and churn; flushed dry standpipe at roof outlet; alarms not complete and will retest for alarms when they are complete 9/21/2000 9:13:56 AM
INSP-Sprinkler Rough-in9/14/20009/18/20009/18/2000APART
DetailsRick Jackson
todd ###-#### hydro okay for standpipes, FDC 9/18/2000 9:33:38 AM
INSP-Sprinkler Rough-in9/7/20009/12/20009/12/2000PFAIL
DetailsRick Jackson
TODD- ###-#### R/I hydro test of 2,3,4,5,6 and attic areas pass; r/i revealed attic area not covered, 6th floor has major deviations from plans requiring resubmittal, head painted on 2nd janitor room, dry standpipe needs pitch to ensire drainage 9/13/2000 11:06:22 AM
Issue permit  2/7/2000 DONE
Alarm Plan Check2/1/2000 2/7/2000 PASS
Revised calculations and clarifications submitted
Telephone call  2/7/2000 PASS
Faxed final review with instruction to attached the modified notes to site plan, etc. (Ref Grinnell Fax3 2/7/00)
Inspection Record Card- Bld2/1/20002/1/20002/1/2000 DONE
Telephone call  2/1/2000 DONE
talked to nancy to verify plans are ready
Sprinkler Plan Check1/31/2000 1/31/2000 PASS
With Conditions attached to notes
Sprinkler Plan Check1/21/2000 1/26/2000 FAIL
Calculation problems.
Telephone call  1/26/2000 FAIL
Faxed review.
Sprinkler Plan Check12/23/1999 12/23/1999 FAIL
Lacking sufficiant pertinent information need to do a correctl review. Items required in NFPA 13 Chapter 6.
Application received  12/15/1999 PASS
Case Summary