GCB-Final | 11/23/2010 | 11/29/2010 | 11/29/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FinalContact: Murray @ ###-####Call in advance please
|
GCB-Footing | 11/3/2010 | 11/4/2010 | 11/4/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FootingsContact: Murray @ ###-####Call in advance
|
GCB-Courtesy | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: CourtesyContact: Murray @ ###-####Call in advance home owner has flashed around house where he is going to pour a concrete slab from 6" above slab to 6" passed stem wall also because of large tree roots he has dug down to nat pit run about 18 " and about 12" wide and around all of the roots he will replace with a 3/4 to 1" drain rock up to top of roots for frost protection concrete the rest this is nostructal slab and is fir frost only he will also put down 2 '' FORM BOURD ok to finish
|
GCB-Final | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | FAIL |
Dave Hannah
|
|
|
Scope of Inspection: FinalContact: Murray @ ###-#### needs landings outside of backdoors
|
GCB-Final | 5/28/2010 | 6/1/2010 | 6/1/2010 | A | DEFR |
Dave Hannah
|
|
|
Scope of Inspection: FinalContact: Murray @ ###-#### rescheduled for pm
|
GCB-Energy | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PASS |
Dave Hannah
|
|
|
murry Phone #: ###-####
|
GCB-Final | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | NR |
Dave Hannah
|
|
|
Murray Phone #: ###-#### this was a framing
|
GCB-Framing | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | PASS |
Dave Hannah
|
|
|
Murray Phone #: ###-#### ok to insulate
|
GCB-Framing | 9/28/2009 | 9/29/2009 | 9/29/2009 | | PART |
Dave Hannah
|
|
|
Morning time please. Contact Muray, @3719902 ok to cover roof and ext also all soffits
|
GCB-Stem wall | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Dave Hannah
|
|
|
Mr. Gustafson Phone #: ###-####
|
GCB-Footing | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Dave Hannah
|
|
|
brent Phone #: ###-#### ok to pour
|
Plan assigned to (SRZ) | 8/10/2009 | 8/10/2009 | 8/12/2009 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/10/2009 | | 8/12/2009 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (GCB) | | | 8/12/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2009 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 8/12/2009 | | DONE |
|
|
|
|
1st review completed | | | 8/12/2009 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | 8/10/2009 | 8/10/2009 | | DONE |
|
|
|
|