GCB-Energy | 7/10/2013 | 7/10/2013 | 7/11/2013 | P | PASS |
Tony Young
|
|
|
Kathy ###-####
|
GCB-Energy | 2/8/2013 | 2/11/2013 | 2/11/2013 | A | PASS |
Dave Hannah
|
|
|
Kathleen @ ###-#### Call in advance OK TO INSULATE
|
GCB-Framing | 12/6/2012 | 12/10/2012 | 12/10/2012 | P | PART |
Dave Hannah
|
|
|
Kathleen @ ###-#### Call in advance4 framing ok needs fire blocking on second level also needs to install energy seal package
|
CHANGE STATUS TO (VOI) | | | 5/7/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (VOI) | | | 5/7/2010 | | DONE |
|
|
|
|
Issue and Courier | | | 9/29/2009 | | DONE |
|
|
|
|
Application received | | 9/29/2009 | | | |
|
|
|
|