Permit Information
Permit NumberGCB09-00062
StatusFinaled
Name R SQUARED
Site Address 4983 N GLENWOOD ST
Project NameBLD2009-00073
Customer Number 
ePlanReview 
Description
(Max Building Renovation) ***12-9-2009 PLAN MODIFICATION - TO CONSTRUCT A 3-HOUR FIRE BARRIER WALL THAT EXTENDS THROUGH THE EXISTING FRONT COMBUSTIBLE CANOPY; CONSTRUCT NEW 1-HOUR FIRE RESISTANCE CONSTRUCTION FOR A DISTANCE OF 4 FEET FROM EACH SIDE OF THE NEW 3 HOUR FIRE BARRIER WALL AT THE TRMINATION OF THE FIRE BARRIER INTO THE COMBUSTIBLE WALL CONSTRUCTION; PROVIDE 3/4 HOUR DOORS OR WINDOWS WITHIN 4 FEET OF THE NEW FIRE BARRIER WALL; PROVIDE AN APPROVED WATER CURTAIN AS PER NFPA 13, SECTION 11.3.3, WITH AN UPGRADED SPRINKLER SYSTEM ON EITHER SIDE OF THE NEW 3-HOUR FIRE BARRIER WALL; ADD 2-HOUR FIRE RESISTAVE CONSTRUCTION/PROTECTION TO THE EXISTING STEEL COLUMNS THAT PROVIDE PRIMARY AND LATERAL SUPPORT FOR THE BUILDINGS ROOF STRUCTURE. ALL WORK PER THE APPROVED PLAN MODIFICATION SHEET AND THE APPROVED ALTERNATE REQUEST LETTER ON FILE. SRZ*** To prepare an existing 61,616 sq. ft.(vacant) commercial shell building for future tenants. NO OCCUPANCY OF THIS STRUCTURE IS ALLOWED UNDER THIS PERMIT. A separate permit is required for a tenant to occupy the space. This is a Scope of Work Permit. Letter of Completion to be issued when done. Work to include: Remove designated interior walls and doors from existing spaces and interior finishes specified on plans; add an electrical panel platform; replace and fix damaged interior finishes; remove existing floor finishes throughout tenant space and replace; remove existing ceiling tiles and add a dropped ceiling grid throughout; patch, re-texture and paint effected walls after demolition work; construct interior 2x steel stud walls; and prepare tenant space for a retail Mercantile occupancy. All work per approved plans, attached plan review report, and all reviewing agencies approvals. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/2/20103/3/20103/3/2010APASS
DetailsDave Hannah
Site Contact: Randy ###-####Scope of Inspection: Final Inspection for NAC Center Shell BuildingAM REQUESTED
GCB-Courtesy1/14/20101/15/20101/15/2010APART
DetailsDave Hannah
Contact # ###-####The applicant wants to meet with a building inspector, regarding the shell construction questions.2hr fire protection around front columns and placement of exit signs
GCB-Framing12/21/200912/22/200912/22/2009APART
DetailsDave Hannah
Contact Dantan @###-#### 3hr fire wall ok to keep covering north side
GCB-Ceiling Grid12/8/200912/9/200912/10/2009APART
DetailsDave Hannah
Contact Danton @###-#### this was not a ceiling grid it was for the sheet rook on the fire wall south side ok to keep going
Plan resubmittals received  12/10/2009 DONE
DetailsSam Zahorka
Recieved Plan modification sheet A3.0 with an Approved Alternate Request Letter signed by the Building Official and the Fire Marshal.
Case Summary (GCB)  12/9/2009 DONE
DetailsSam Zahorka
GCB-Framing12/3/200912/4/200912/4/2009APART
DetailsDave Hannah
Contact Kely@###-#### 3hr area seperation wall ok to start sheetrocking
Telephone call  11/10/2009 DONE
DetailsSam Zahorka
It was brought to my attention this building may not be a type IIIb building and is possibly a Vb building. I asked the structural inspector (Dave Hannah) to verify the type of construction. He stated the front exterior wall is wood framing but non-structural. I have corrected the type of construction in this permit to be type Vb. I also called Garden City and the new Architect Joe Thompson and gave them this information. SRZ
GCB-Courtesy11/3/200911/5/200911/5/2009APART
DetailsDave Hannah
Contact Danton @###-#### walked project with contractor looked at ext stairs will fix handrails
Plan assigned to (SRZ)10/6/200910/6/200910/9/2009 DONE
DetailsSam Zahorka
Routing - PLAN CHECK10/6/2009 10/9/2009 PASS
DetailsSam Zahorka
Case Summary (GCB)  10/9/2009 DONE
DetailsSam Zahorka
1st review completed  10/9/2009 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  10/9/2009 DONE
DetailsSam Zahorka
Issue and Courier  10/9/2009 DONE
DetailsBarbara Stitt
Application received 10/6/2009