GCB-Final | 3/2/2010 | 3/3/2010 | 3/3/2010 | A | PASS |
Dave Hannah
|
|
|
Site Contact: Randy ###-####Scope of Inspection: Final Inspection for NAC Center Shell BuildingAM REQUESTED
|
GCB-Courtesy | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | PART |
Dave Hannah
|
|
|
Contact # ###-####The applicant wants to meet with a building inspector, regarding the shell construction questions.2hr fire protection around front columns and placement of exit signs
|
GCB-Framing | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Dave Hannah
|
|
|
Contact Dantan @###-#### 3hr fire wall ok to keep covering north side
|
GCB-Ceiling Grid | 12/8/2009 | 12/9/2009 | 12/10/2009 | A | PART |
Dave Hannah
|
|
|
Contact Danton @###-#### this was not a ceiling grid it was for the sheet rook on the fire wall south side ok to keep going
|
Plan resubmittals received | | | 12/10/2009 | | DONE |
Sam Zahorka
|
|
|
Recieved Plan modification sheet A3.0 with an Approved Alternate Request Letter signed by the Building Official and the Fire Marshal.
|
Case Summary (GCB) | | | 12/9/2009 | | DONE |
Sam Zahorka
|
|
|
|
GCB-Framing | 12/3/2009 | 12/4/2009 | 12/4/2009 | A | PART |
Dave Hannah
|
|
|
Contact Kely@###-#### 3hr area seperation wall ok to start sheetrocking
|
Telephone call | | | 11/10/2009 | | DONE |
Sam Zahorka
|
|
|
It was brought to my attention this building may not be a type IIIb building and is possibly a Vb building. I asked the structural inspector (Dave Hannah) to verify the type of construction. He stated the front exterior wall is wood framing but non-structural. I have corrected the type of construction in this permit to be type Vb. I also called Garden City and the new Architect Joe Thompson and gave them this information. SRZ
|
GCB-Courtesy | 11/3/2009 | 11/5/2009 | 11/5/2009 | A | PART |
Dave Hannah
|
|
|
Contact Danton @###-#### walked project with contractor looked at ext stairs will fix handrails
|
Plan assigned to (SRZ) | 10/6/2009 | 10/6/2009 | 10/9/2009 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/6/2009 | | 10/9/2009 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (GCB) | | | 10/9/2009 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 10/9/2009 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2009 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 10/9/2009 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 10/6/2009 | | | |
|
|
|
|