Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberGCB09-00092
StatusFinaled
Name BRSARCHITECTS
Site Address 4983 N Glenwood
Project NameBLD2009-00097
Customer Number 
ePlanReview 
Description
NAC Center Thrift Store/Animal Pharmacy - To remodel a portion of an existing building for a Thrift Store/Animal Pharmacy Tenant per the approved plans. The total new tenant size will be 31,330 square feet (29,876 sq. ft. Thrift Store / 1,454 Animal Pharmacy). This building was previously reviewed under BLD2009-00073 to renovate and prepare this building for future Tenant Improvements. Work in the Animal Pharmacy portion to include: Construction of new interior stud frame partition walls to separate the waiting room, the exam room, treatment room, surgery room, and adoption center room; infill the existing restroom door wall opening and relocate the door location; install a dental style sink; install a 9050 glass window; install cabinetry; installation of suspended ceiling system with related lighting and miscellaneous related interior finishes. Work in the Thrift Store portion of the tenant space to include: demolish portions of some existing walls and doors in the rear storage areas: relocate the existing double swing doors and frame currently located in the processing room wall; construct a new interior partition wall to create a new hallway between the storage and processing rooms; construct a new interior partition wall at the shopping cart area. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered for area increase. All alterations and modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. **SRZ** GCB09-00062, PWU2009-00142
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/2/20103/3/20103/3/2010APASS
DetailsDave Hannah
Site Contact: Randy ###-####Scope of Inspection: Final Inspection for NAC Center- Retail Side - TIAM REQUESTED
GCB-Framing2/2/20102/3/20102/3/2010APASS
DetailsDave Hannah
Contact Dale ok to cover walls after all other trades are aproved
Plan assigned to (SRZ)1/13/20101/13/20102/1/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK1/22/2010 2/1/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/1/2010 DONE
DetailsSam Zahorka
Case Summary (GCB)  2/1/2010 DONE
Issue and Courier  2/1/2010 DONE
Details
Routing - PLAN CHECK1/13/2010 1/22/2010 FAIL
DetailsSam Zahorka
Corrections needed.
1st review completed  1/22/2010 DONE
DetailsSam Zahorka
Telephone call  1/22/2010 DONE
DetailsSam Zahorka
Telephoned the Architect and explained corrections that are needed.
Telephone call  1/22/2010 DONE
Details
called dave hannah to pick up plans and return to garden city
Case Summary (GCB)  1/21/2010 DONE
DetailsSam Zahorka
CHANGE STATUS TO (REV)  1/13/2010 DONE
was automatically put in issued status when created
Application received  12/4/2009 DONE