GCB-Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Mike Jordan
|
|
|
Scope of Inspection: Final (Re-Inspection)Contact: Rich @ ###-####. All issues have been repaired and found to be in compliance. final ok.
|
GCB-Final | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | FAIL |
Dave Hannah
|
|
|
Scope of Inspection: FinalContact: Rich @ ###-####needs to fine grade lot and landings on back of house
|
GCB-Energy | 4/15/2010 | 4/16/2010 | 4/16/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of inspection: Wall installation energy inspectionContact: Rich @ ###-####Customer has requested A.M. inspection please
|
GCB-Framing | 4/14/2010 | 4/15/2010 | 4/15/2010 | A | PASS |
Dave Hannah
|
|
|
Please call Rich at ###-#### ok to insulate
|
GCB-Footing | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Dave Hannah
|
|
|
|
GCB-Footing | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | CANC |
Dave Hannah
|
|
|
Scope of Inspection: Footings for New Residential HomeSite Contact: Bill - ###-####PM Preferred
|
Plan assigned to (SRZ) | 3/3/2010 | 3/3/2010 | 3/4/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2010 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 3/4/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 3/4/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 3/2/2010 | | DONE |
|
|
|
was put in issue status automatically
|
Application received | | | 2/26/2010 | | DONE |
|
|
|
|