Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB10-00019
StatusFinaled
Name CM COMPANY
Site Address 10482 W CARLTON BAY DR
Project NameBLD2010-00015
Customer Number 
ePlanReview 
Description
(Primary Health Corporate Offices) - To construct a new 7,630 square foot, single story, Type VA-rated, Office building and related site improvements per the approved plans. This buildings space will consist of: offices, restrooms, break rooms, workrooms, conference rooms, reception areas, and accessory rooms. This building will be fully fire sprinklered for substitution of one hour fire-resistance-rated construction although the North, South, and West walls were required to be one hour fire-resistance-rated construction per IBC Section 602. This building is located in the Flood Plain. All work shall comply with the approved drawings, the plan review report, and all applicable codes. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/4/201011/8/201011/8/2010APASS
DetailsDave Hannah
Scope: FinalContact: Rob @ ###-####
GCB-Ceiling Grid10/25/201010/26/201010/26/2010APASS
DetailsMike Jordan
Scope: Ceiling GridContact: Rob @ ###-####. Ceiling grid ok.
GCB-Energy9/3/20109/7/20109/7/2010APASS
DetailsDave Hannah
Scope: EnergyContact: Rob @ ###-####
GCB-Framing9/3/20109/7/20109/7/2010APASS
DetailsDave Hannah
Scope: FramingContact: Rob @ ###-####
GCB-Framing8/24/20108/25/20108/25/2010APASS
DetailsDave Hannah
Scope: FramingContact: Rob @ ###-#### ok to cover ext walls and ok to insulate also int framing ok
GCB-Framing7/28/20108/2/20108/2/2010APART
DetailsDave Hannah
Scope: FramingContact: Rob @ ###-#### ok to cover roof
Case Summary (GCB)  7/26/2010 DONE
GCB-Footing6/16/20106/17/20106/18/2010PPASS
DetailsDave Hannah
rob - needs insp between noon and 2 due to concrete scheduling - please call if unable to make it during this time Phone #: ###-####
Plan assigned to (SRZ)4/23/20104/23/20105/20/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/18/2010 5/20/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  5/20/2010 DONE
DetailsSam Zahorka
Issue and Courier  5/20/2010 DONE
Telephone call  5/20/2010 DONE
DetailsSam Zahorka
Spoke with David Ruby the architect about Flood hazard construction requirements including: the lowest floor of this structure elevated above the base flood elevation; Engineered fill and soil tests for compaction; Verfied with him that the whole site was elevated above base flood elevation. SRZ
Plan resubmittals received  5/18/2010 DONE
rec'd response letter from david ruby - 1 sheet of a2.11 and 1 sheet of a6.12 - taken to sam zahorka
Plan resubmittals received  5/18/2010 DONE
DetailsSam Zahorka
Received all three sets of plans from Dave Hannah.
Routing Off Site - STRUCTURAL4/23/2010 5/12/2010 PASS
DetailsSam Zahorka
Structural Review passed. Comments are attached.
Plan resubmittals requested  4/30/2010 DONE
DetailsSam Zahorka
Routed failed plan submittals to Garden City. Sent Plan Review correction report to Garden City.
Routing - PLAN CHECK4/23/2010 4/30/2010 FAIL
DetailsSam Zahorka
1st Review
1st review completed  4/30/2010 DONE
DetailsSam Zahorka
Application received 4/23/2010