GCB-Final | 11/4/2010 | 11/8/2010 | 11/8/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FinalContact: Rob @ ###-####
|
GCB-Ceiling Grid | 10/25/2010 | 10/26/2010 | 10/26/2010 | A | PASS |
Mike Jordan
|
|
|
Scope: Ceiling GridContact: Rob @ ###-####. Ceiling grid ok.
|
GCB-Energy | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: EnergyContact: Rob @ ###-####
|
GCB-Framing | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FramingContact: Rob @ ###-####
|
GCB-Framing | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FramingContact: Rob @ ###-#### ok to cover ext walls and ok to insulate also int framing ok
|
GCB-Framing | 7/28/2010 | 8/2/2010 | 8/2/2010 | A | PART |
Dave Hannah
|
|
|
Scope: FramingContact: Rob @ ###-#### ok to cover roof
|
Case Summary (GCB) | | | 7/26/2010 | | DONE |
|
|
|
|
GCB-Footing | 6/16/2010 | 6/17/2010 | 6/18/2010 | P | PASS |
Dave Hannah
|
|
|
rob - needs insp between noon and 2 due to concrete scheduling - please call if unable to make it during this time Phone #: ###-####
|
Plan assigned to (SRZ) | 4/23/2010 | 4/23/2010 | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/18/2010 | | 5/20/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/20/2010 | | DONE |
|
|
|
|
Telephone call | | | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
Spoke with David Ruby the architect about Flood hazard construction requirements including: the lowest floor of this structure elevated above the base flood elevation; Engineered fill and soil tests for compaction; Verfied with him that the whole site was elevated above base flood elevation. SRZ
|
Plan resubmittals received | | | 5/18/2010 | | DONE |
|
|
|
rec'd response letter from david ruby - 1 sheet of a2.11 and 1 sheet of a6.12 - taken to sam zahorka
|
Plan resubmittals received | | | 5/18/2010 | | DONE |
Sam Zahorka
|
|
|
Received all three sets of plans from Dave Hannah.
|
Routing Off Site - STRUCTURAL | 4/23/2010 | | 5/12/2010 | | PASS |
Sam Zahorka
|
|
|
Structural Review passed. Comments are attached.
|
Plan resubmittals requested | | | 4/30/2010 | | DONE |
Sam Zahorka
|
|
|
Routed failed plan submittals to Garden City. Sent Plan Review correction report to Garden City.
|
Routing - PLAN CHECK | 4/23/2010 | | 4/30/2010 | | FAIL |
Sam Zahorka
|
|
|
1st Review
|
1st review completed | | | 4/30/2010 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | 4/23/2010 | | | |
|
|
|
|