GCB-Final | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FinalContact: Rich @ ###-####Call for access
|
GCB-Energy | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of Inspection: Energy (Insulation)Contact: Rich @ ###-####
|
GCB-Energy | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Mike Jordan
|
|
|
Scope of Inspection: EnergyContact: Rich @ ###-####. airseal ok.
|
GCB-Framing | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Mike Jordan
|
|
|
Scope of Inspection: FramingContact: Rich @ ###-####. ok to insulate.
|
GCB-Footing | 5/21/2010 | 5/24/2010 | 5/24/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of inspection: FootingContact: Bill 2 ###-####
|
Plan assigned to (SRZ) | 5/17/2010 | 5/17/2010 | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
I Spoke with Jenah at Garden City about Flood Plain construction requirements. She verified the Flood plain base line elevation certificate and indicated all floors are above. Engineered fill has been brought in and raised building pad.
|
Routing - PLAN CHECK | 5/20/2010 | | 5/20/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/20/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/17/2010 | | 5/18/2010 | | FAIL |
Sam Zahorka
|
|
|
No Floodplain certificate. Waiting for call back from Garden City.
|
1st review completed | | | 5/18/2010 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 5/10/2010 | | DONE |
|
|
|
|