(Distilled Spirits USA) ***9-29-10 PLAN MODIFICATION RECEIVED TO INCLUDE: REVISED TANK LAYOUT, NEW SPILL CONTAINMENT RETENTION BERM DESIGN, AND INFORMATION FOR MATERIAL SPILL CONTROL PROCESS PER THE APPROVED PLANS*** To remodel an existing 1,500 square foot tenant space in an existing 4,500 square foot building for use as a Mixing facility for alcohol based spirits. Work to include: Add (1) layer of 5/8" type 'X' sheetrock to each side of the tenant demising wall; Add a new exterior exit door, exterior landing and a 4 ft. concrete walkway to the West side of the building; construct spill drainage and containment per plans; install a new service sink; install a new work sink; install panic exit hardware on all exit doors; related interior finishes in compliance with chapter 8 of the 2006 IBC; plumbing, electrical and HVAC work; and all other work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved. This building is required to be partially fire sprinklered for the occupancy change to a high hazard occupancy group H. A separate permit is required for the installation of the automatic sprinkler system. Automatic sprinkler systems shall be designed and installed in accordance per NFPA #13 as regulated by the fire department. A 3-hour Fire Barrier, Fire Area separation wall, separates this tenant from the rest of the building. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final9/30/201010/1/201010/1/2010APASS
DetailsDave Hannah
Scope: FinalContact: Walt @ ###-####
Case Summary (GCB)  9/30/2010 DONE
CHANGE STATUS TO (REV)  9/29/2010 DONE
plan mod received
Meeting  9/22/2010 DONE
DetailsSam Zahorka
Meeting at the building site with the applicant, the architect, the Fire reviewer, and myself to go over corrections needed for the plan modification resubmittals. Explained all changes from the approved plans need to be detailed on the plan modification submittals. Also suggested they obtain a mechanical permit along with the required inspections. All plan modification items are IFC changes - (Spill control and secondary containment design).
Plan assigned to (SRZ)5/28/20105/28/20107/6/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/29/2010 7/6/2010 PASS
DetailsSam Zahorka
Permit issuance pending Mechanical Review to pass. Contact Lee Rice.
Routing - PLAN CHECK7/6/2010 7/6/2010 PASS
DetailsTroy James
Route to Mechanical review per Lee Rice.
Case Summary (GCB)  7/6/2010 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/6/2010 DONE
DetailsSam Zahorka
Issue and Courier  7/6/2010 DONE
Plan resubmittals received  6/29/2010 DONE
Details
3 sets rec'd
Meeting  6/22/2010 DONE
DetailsSam Zahorka
Meeting here at Boise city with the applicant, the architect, the Fire reviewer, and myself to go over corrections and resubmittals.
Re-submittals with all corrections made (including mechanical plans) were promised to be resubmitted by 6/25/10 so the permit could be issued for the applicant. Resubmittals were not recieved until 6/29/10.
Plan resubmittals requested  6/14/2010 DONE
DetailsSam Zahorka
Telephone call  6/14/2010 DONE
DetailsSam Zahorka
Telephone conversation with Walt Kerpa the applicant. Explained the 1st review is complete and Garden City should be sending it to him and the Architect this afternoon. I suggested he schedule a meeting with Garden City for this Wednesday morning to discuss Plan Review Corrections.
Telephone call  6/14/2010 DONE
DetailsSam Zahorka
Left message with the Architect to contact me to go over plan review corrections.
Routing - PLAN CHECK5/28/2010 6/11/2010 FAIL
DetailsSam Zahorka
Plan Review corrections Required.
Case Summary (GCB)  6/11/2010 DONE
DetailsSam Zahorka
1st review completed  6/11/2010 DONE
DetailsSam Zahorka
Failed 2006 IBC Plan Check. SRZ
Application received  5/24/2010 DONE
DetailsBarbara Stitt