Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB10-00038
StatusFinaled
Name Granite Contracting
Site Address 4224 CHINDEN BLVD
Project NameBLD2010-00034
Customer Number 
ePlanReview 
Description
(KC Auto Paint & Supplies, Inc.) - To remodel an existing 5,900 square foot building for use as an Auto Paint Sales and Supply Store. Work to include: construct new interior non-bearing partition walls to create a new accessible restroom, a new 162 square foot Mixing room, a new fire sprinkler system room, and a wall to separate the Display/Sales Area from the Warehouse/Storage Area; install a new dual height (hi-lo) accessible drinking fountain; remove select windows and replace with new, install a new window unit and header per engineering; remove select existing doors and replace with new and associated hardware; Installation of a suspended ceiling system; related interior finishes in compliance with chapter 8 of the 2006 IBC; plumbing, mechanical and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. A Certificate of Occupancy is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final4/13/20114/14/20114/14/2011APASS
DetailsDave Hannah
FinalMitch @ ###-####PM Inspection
GCB-Ceiling Grid3/30/20113/31/20113/31/2011APASS
DetailsMike Jordan
Ceiling GridMitch @ ###-####Call in advance please. Ceiling grid ok to cover.
GCB-Ceiling Grid3/24/20113/25/20113/25/2011ANR
DetailsMike Jordan
Ceiling GridMitch @ ###-####Call in advance please - AM Inspection. Neesd to install remainder of clips and provide wires for diffusers.
GCB-Energy1/13/20111/14/20111/14/2011APART
DetailsMike Jordan
Scope: EnergyContact: Mitch @ ###-####. Plan review notes were provided. Needs to show provided windows with U-factor of .99 will meet the prescriptive method of the IECC, max u-factor should have been .45. Ok to cover.
GCB-Framing1/11/20111/12/20111/12/2011ACANC
DetailsMike Jordan
Scope: Framing
Contact: Mitch @ ###-####
PM Inspection Please. Inspection was done in the PM.
GCB-Framing1/12/20111/12/20111/12/2011PPART
DetailsMike Jordan
Interior wood framed walls and furouts only. Needs to install all backing for ada elements in restroom and provide plan review notes. ok to insulate.
Plan assigned to (SRZ)7/23/20107/23/201010/18/2010 DONE
DetailsSam Zahorka
Failed 2nd Review - 10/8/10
Routing - PLAN CHECK10/18/2010 10/18/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  10/18/2010 DONE
DetailsSam Zahorka
Issue and Courier  10/18/2010 DONE
Plan resubmittals received  10/15/2010 DONE
Case Summary (GCB)  10/8/2010 DONE
DetailsSam Zahorka
Plan resubmittals requested  10/8/2010 DONE
DetailsSam Zahorka
See plan review report dated 10-7-10
Routing - PLAN CHECK9/30/2010 10/8/2010 FAIL
DetailsSam Zahorka
Resubmittals requested.
Plan resubmittals received  9/30/2010 DONE
Plan resubmittals requested  8/30/2010 DONE
DetailsSam Zahorka
Initial review letter sent. Resubmittals have been requested.
Telephone call  8/30/2010 DONE
DetailsSam Zahorka
I spoke with the architect George McLean about the intital plan review letter I sent. We concluded until we get the occupancy classification clarified a plan review could not be completed. I also suggested he call me prior to resubmitting that way we could identify any other major items defined by our occupancy classification answer. SRZ
Routing - PLAN CHECK7/23/2010 8/26/2010 FAIL
DetailsSam Zahorka
Flammable liquid storage amounts need to be clarified prior to completeing the 1st review.
1st review completed  8/26/2010 FAIL
DetailsSam Zahorka
Telephone call  8/26/2010 DONE
DetailsSam Zahorka
Spoke with Ron Amandus with the Fire Department. Discussed his review and need the applicant to submit a storage rack layout, identify the aisles, and identify the amount of storage.
Telephone call  8/26/2010 DONE
DetailsSam Zahorka
I spoke with the Architect George Mclean about the occupancy classification of this tenant. He stated he originaly evaluated this building as a mixed occupancy S-1 and M. The submitted plans show this. He shared that the applicant, owner, the fire inspector/reviewer, Matt the Fire Sprinkler guy, and himself all met at Garden City hall and communicated this tenant to be a Hazardous Occupancy (H-3 or H-2). He stated the materials (type of liquid), Class, amounts, and locations of the anticipated contents will not be provided until the owner is ready to occupy the building. I then explained to Mr. Mclean the permit issuance is pending this information. he requested a letter to explain what is needed so he could give it to his clients.
Application received  6/28/2010 DONE