GCB-Final | 1/27/2011 | 1/28/2011 | 1/28/2011 | A | PASS |
Mike Jordan
|
|
|
Scope: FinalContact: Don @ ###-####Call for access. final ok.
|
GCB-Footing | 1/13/2011 | 1/13/2011 | 1/13/2011 | P | PASS |
Mike Jordan
|
|
|
Footing& Foundation inspection-Don Phone #: ###-####
|
GCB-Fndatn/slab ins/fld vent | 1/11/2011 | 1/12/2011 | 1/12/2011 | A | CANC |
Mike Jordan
|
|
|
Scope: FoundationContact: Don @ ###-####.Cancelled by Don via phone call.
|
GCB-Footing | 1/11/2011 | 1/12/2011 | 1/12/2011 | A | CANC |
Mike Jordan
|
|
|
Scope: FootingsContact: Don @ ###-####. Cancelled by Don via phone call.
|
Issue and Courier | | | 12/6/2010 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 8/17/2010 | 8/17/2010 | 12/3/2010 | | DONE |
Sam Zahorka
|
|
|
Failed 2nd review on 11-23-10
|
Routing - PLAN CHECK | 12/3/2010 | | 12/3/2010 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2010 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/23/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/17/2010 | | 11/22/2010 | | FAIL |
Sam Zahorka
|
|
|
Plan resubmittals do not match original submittals. Square footage is different, there seems to be two structures now, the uniform snow load is in question, the location of the strucutre on the site plan has changed, and the structure(s) have no foundations and a soils investigation might be required. I called and left a message with the architect/applicant scott wendell.
11-23-10 New application recieved with new permit number and applicant. Don Roell - SEE (BLD2###-####2 GCB10-00078)
|
Telephone call | | | 11/22/2010 | | DONE |
Sam Zahorka
|
|
|
I left a message with the Architect/applicant Scott Wendell. Resubmittals do not match the original submittals.???
|
Telephone call | | | 11/22/2010 | | DONE |
Sam Zahorka
|
|
|
I spoke with Leon at Garden city and he gave me Dawn Roell's telephone number. He stated the scope of the project has changed and the new applicant is mr. Roell. A new application was received BLD2###-####2 - GCB10-00078
|
Plan resubmittals received | | | 11/15/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/19/2010 | | DONE |
|
|
|
|
1st review completed | | | 8/17/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/17/2010 | | 8/17/2010 | | FAIL |
Sam Zahorka
|
|
|
Metal building drawings and calculations needed prior to permit issuance.
|
Application received | | | 8/4/2010 | | DONE |
|
|
|
|