GCB-Final | 6/24/2011 | 6/27/2011 | 6/27/2011 | A | PASS |
Mike Jordan
|
|
|
Finalmel @ ###-####call in advance. Smoke alarms repaired. Structural final ok.
|
GCB-Final | 6/14/2011 | 6/15/2011 | 6/15/2011 | A | FAIL |
Mike Jordan
|
|
|
FinalMel @ ###-####Call in advance. Smoke detectors are not interconected.
|
GCB-Final | 12/28/2010 | 12/29/2010 | 12/29/2010 | A | NR |
Dave Hannah
|
|
|
Scope: FinalContact: Mel @ ###-####AM inspection please this inspection was for a framing /insulation inspection owner has already covered with sheetrock but framing was ok on last inspection and ext walls and attic are insulated so ok to finish
|
GCB-Framing | 9/28/2010 | 9/29/2010 | 9/29/2010 | A | PART |
Dave Hannah
|
|
|
Scope: FramingContact: Mel @ ###-####Call in advance please needs mec and elec rough ins framing ok needs seal package
|
Issue and Courier | | | 8/24/2010 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 8/20/2010 | 8/20/2010 | 8/23/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/20/2010 | | 8/23/2010 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 8/23/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2010 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 8/20/2010 | | DONE |
|
|
|
|