Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB10-00062
StatusFinaled
Name BAR S CONSTRUCTION LLC
Site Address 3301 W CHINDEN BLVD
Project NameBLD2010-00058
Customer Number 
ePlanReviewNo
Description
(WELLS FARGO) - To remodel the interior portion of an existing 1,940 square foot existing bank building. Remodel work to include: interior demo per plans; construct a new section of teller line includuding a connected ADA service counter; upgrade the existing portions of the teller line counters per plans; provide a new counter surface to the existing check writing stand; provide new floor tile per locations on plans; extend the existing raised floor platform at the new service manager desk location; remove and replace the existing aluminum store front entry doors in their existing frames; provide mill work and related interior finishes in compliance with chapter 8 of the 2006 IBC; and electrical work. All work shall comply with the approved drawings, the plan review report, and all other reviewing agencies approvals. The existing envelope is not being affected by this permit. This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/4/2011 DONE
DetailsSam Zahorka
Spoke with Greg w/ JGT Architecture. He requested to modify the swing of one of the two doors in a series. I checked the prescriptive code section 1105.1 and ICC/ANSI A117.1-2003 section 404.2.5. Due to both of these section the swing can not be modified to swing in both directions. Atleast 60% of all public entrances shall be accessible. SRZ
GCB-Final12/30/20101/3/20111/3/2011APASS
DetailsDave Hannah
Scope: FinalContact: Jenny @ ###-####Call in advance please
GCB-Framing11/15/201011/16/201011/16/2010APASS
DetailsDave Hannah
Scope: FramingContact: John @ ###-#### framing over stairs ok
Plan assigned to (SRZ)9/9/20109/9/20109/21/2010 DONE
DetailsSam Zahorka
Meeting  9/21/2010 DONE
DetailsBarbara Stitt
Additional plans recieved from Garden City
Issue and Courier  9/21/2010 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK9/21/2010 9/21/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/21/2010 DONE
DetailsSam Zahorka
Plan resubmittals requested  9/15/2010 DONE
DetailsSam Zahorka
1st review completed  9/15/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK9/9/2010 9/15/2010 FAIL
DetailsSam Zahorka
Application received  9/8/2010 DONE