GCB-Final | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
Final - for final C of OScott @ ###-####Call in advance ok for pern occ by 408
|
GCB-Final | 7/7/2011 | 7/8/2011 | 7/8/2011 | A | PART |
Mike Jordan
|
|
|
FinalScott @ ###-####AM Inspection please. Ok gor temp. occ. if allowed by garden city. Needs to install remainder of tempered glazing, reinstal vertical grab bars in both restrooms to code compliant dimensions. Thumbturn was removed at rear exit and contractor to have new door with code compliant hardware installed.
|
GCB-Ceiling Grid | 5/24/2011 | 5/25/2011 | 5/25/2011 | A | PASS |
Mike Jordan
|
|
|
Ceiling GridIvy or John @ ###-####Call in advance
|
GCB-Framing | 4/29/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Dave Hannah
|
|
|
FramingIvy @ ###-####Call in advance - AM Inspection ok to cover gas tank closet
|
GCB-Framing | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Mike Jordan
|
|
|
FramingJason @ ###-####
|
GCB-Framing | 4/18/2011 | 4/19/2011 | 4/19/2011 | A | PART |
Mike Jordan
|
|
|
FramingScott @ ###-####Call in Advance Please - AM Inspection. Exterior shear and holdowns ok. Need to see airseal and fireblocking prior to insulation. Also needs to remove or box out non listed boxes in 1hr. fire barrier for gas room. Also spoke to contractor about 1hr. lid.
|
GCB-Footing | 1/12/2011 | 1/13/2011 | 1/13/2011 | A | PART |
Mike Jordan
|
|
|
Scope: FootingsContact: Bill @ ###-####Possible PM Inspection - Call in advance to confirm. Perimeter and interior footings. All forms in place, Work in progress on placing vertical reinforcement.
|
GCB-Footing | 1/11/2011 | 1/12/2011 | 1/12/2011 | A | CANC |
Mike Jordan
|
|
|
Scope: FootingsContact: Bill @ ###-####PM Inspection Please
|
GCB-Footing | 1/12/2011 | 1/12/2011 | 1/12/2011 | P | CANC |
Mike Jordan
|
|
|
Cancelled by concrete contractor via phone call.
|
Plan assigned to (SRZ) | 11/24/2010 | 11/24/2010 | 12/22/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 12/15/2010 | | 12/22/2010 | | PASS |
Sam Zahorka
|
|
|
Pending Plumbing to pass.
|
Plan resubmittals received | | | 12/22/2010 | | DONE |
|
|
|
|
Miscellaneous Hourly | | | 12/22/2010 | | PASS |
Bill VanDegrift
|
|
|
2nd Review per resubmitted plans and 2003 upc
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/22/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/16/2010 | | DONE |
|
|
|
|
Miscellaneous Hourly | | | 12/15/2010 | | FAIL |
Bill VanDegrift
|
|
|
New commercial building. (Plumbing Review)
(1) resubmitted plan shows sewer stub out on the south west corner(SD-1 dated 12/6/10) the sewer for this project is located on the north side of the building. (2) SD-1 dated 11/19/10 shows sewer routing through adjoining parcel, no easement indicated. (3) Resubmitted SD-1 shows a 1" water service, plumbing plan shows 1 1/2" water inside building. Plan shows 1 1/2" RP on the second floor without adequate drainage. Resize water system to provide a 1" RP with a 3"or 4" indirect waste receptor or relocate RP to an area where 1 1/2" discharge can be handled.
|
Miscellaneous Hourly | | | 12/14/2010 | | DONE |
Troy James
|
|
|
New commercial building (Mechanical Review)
|
Routing - PLAN CHECK | 11/24/2010 | | 12/10/2010 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 12/10/2010 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 12/6/2010 | | DONE |
|
|
|
|
Application received | | | 11/23/2010 | | DONE |
|
|
|
|