GCB-Final | 9/13/2011 | 9/13/2011 | 9/13/2011 | P | PASS |
Dave Hannah
|
|
|
kelly - ###-####
|
GCB-Final | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | PART |
Dave Hannah
|
|
|
Kelly @ ###-####PM InspectionCall in advance everything is ok but no sign off card on site and needs other trades finals
|
GCB-Framing | 7/7/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Mike Jordan
|
|
|
FramingKelly @ ###-####Call in advance. Energy code inspection also done. ok to cover.
|
GCB-Framing | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | FAIL |
Mike Jordan
|
|
|
FramingKelly @ ###-####Call in advance to discuss potential issue with insulation. Provide truss engineering, incapsulate kneewalls at coffered cilings, provide tempered glazing at masterbedroom.
|
Plan assigned to (SRZ) | 6/1/2011 | 6/1/2011 | 6/1/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2011 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/1/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/31/2011 | | 6/1/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 5/31/2011 | | DONE |
|
|
|
|
GCB-Stem wall | 5/13/2011 | 5/18/2011 | 5/18/2011 | A | PASS |
Dave Hannah
|
|
|
StemwallRyan @ ###-####Call in advance
|
GCB-Fndatn/slab ins/fld vent | 5/13/2011 | 5/18/2011 | 5/18/2011 | A | PASS |
Dave Hannah
|
|
|
FoundationRyan @ ###-####Call in advance
|
GCB-Fndatn/slab ins/fld vent | 5/13/2011 | 5/17/2011 | 5/18/2011 | A | CANC |
Dave Hannah
|
|
|
FoundationRyan @ ###-####Call in advance
|
GCB-Stem wall | 5/13/2011 | 5/17/2011 | 5/18/2011 | A | CANC |
Dave Hannah
|
|
|
StemwallRyan @ ###-####Call in advance
|
GCB-Stem wall | 5/13/2011 | 5/16/2011 | 5/17/2011 | A | CANC |
Dave Hannah
|
|
|
StemwallRyan @ ###-####Call in advance
|
GCB-Fndatn/slab ins/fld vent | 5/13/2011 | 5/16/2011 | 5/17/2011 | A | CANC |
Dave Hannah
|
|
|
FoundationRyan @ ###-####Call in advance
|
GCB-Footing | 5/10/2011 | 5/12/2011 | 5/13/2011 | A | PASS |
Dave Hannah
|
|
|
FootingsRyan @ ###-####Call in advance to verify Floodplain Elevation issues have been addressed.
|
GCB-Footing | 5/10/2011 | 5/11/2011 | 5/12/2011 | A | CANC |
Dave Hannah
|
|
|
FootingsRyan @ ###-####Call in advance to verify Floodplain Elevation issues have been addressed.
|
GCB-Footing | 5/9/2011 | 5/10/2011 | 5/11/2011 | A | FAIL |
Dave Hannah
|
|
|
FootingsRyan @ ###-####PM Inspection no flood plan elev to check elev
|
Plan assigned to (SRZ) | 12/14/2010 | 12/14/2010 | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 12/14/2010 | | 12/15/2010 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/15/2010 | | DONE |
|
|
|
|
Application received | | | 12/13/2010 | | DONE |
|
|
|
|