GCB-Final | 5/11/2011 | 5/12/2011 | 5/12/2011 | A | PASS |
Dave Hannah
|
|
|
FinalKelly @ ###-####Please discuss ongoing issue with Floodplain
|
GCB-Energy | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Mike Jordan
|
|
|
EnergyKelly @ ###-####
|
GCB-Framing | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Mike Jordan
|
|
|
FramingKelly @ ###-####. All framing issues have been resolved. Framing ok.
|
GCB-Framing | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | FAIL |
Mike Jordan
|
|
|
FramingKelly @ ###-####. Provide approved plans with all notes. Repair 2x6 top plate at bearing wall and fire block hole. Additional straps required at portal frame at garage. Fireblock area above fireplace were fire could pass horizontally into attic. correction notice posted. ok to insulate.
|
GCB-Fndatn/slab ins/fld vent | 1/6/2011 | 1/7/2011 | 1/7/2011 | A | PASS |
Dave Hannah
|
|
|
Scope: FoundationContact: Dane @ ###-####late AM inspection please
|
GCB-Footing | 1/5/2011 | 1/6/2011 | 1/6/2011 | A | PASS |
Dave Hannah
|
|
|
Scope: FootingsContact: Dane @ ###-####PM inspection please set backs ore good . Ground isnt froze ok to pour
|
GCB-Footing | 1/4/2011 | 1/5/2011 | 1/5/2011 | A | NR |
Dave Hannah
|
|
|
Scope: FootingsContact: Dane @ ###-#### still trying to dig ftg about 8 inchs of frost
|
GCB-Footing | 1/3/2011 | 1/4/2011 | 1/4/2011 | A | CANC |
Dave Hannah
|
|
|
Scope: FootingsContact: Dane @ ###-####PM Inspection Please to cold
|
GCB-Footing | 12/30/2010 | 1/3/2011 | 1/3/2011 | A | CANC |
Dave Hannah
|
|
|
Scope: FootingsContact: Dane @ ###-####PM inspection please
|
Plan assigned to (SRZ) | 12/14/2010 | 12/14/2010 | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 12/14/2010 | | 12/15/2010 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2010 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/15/2010 | | DONE |
|
|
|
|
Application received | | | 12/13/2010 | | DONE |
|
|
|
|