GCB-Final | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | PASS |
Dave Hannah
|
|
|
Rob @ ###-####PM Inspection
|
GCB-Final | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | NR |
Dave Hannah
|
|
|
Rob @ ###-####
|
GCB-Energy | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Dave Hannah
|
|
|
EnergyRob @ ###-#### ok to cover framing c/n items completed
|
GCB-Framing | 7/29/2011 | 8/1/2011 | 8/2/2011 | A | PART |
Dave Hannah
|
|
|
FramingRob @ ###-####PM Inspection ok to insulate needs fire blocking and tighten nut on wall to truss connections nail off two ply truss
|
GCB-Framing | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | NR |
Dave Hannah
|
|
|
FramingRob @ ###-####Call in advance - PM Inspection
|
GCB-Shearwall | 7/22/2011 | 7/25/2011 | 7/26/2011 | A | PASS |
Dave Hannah
|
|
|
Shearwall (Shearnailing Roofnailing)Rob @ ###-####Call in advance
|
GCB-Framing | 7/18/2011 | 7/19/2011 | 7/19/2011 | A | PART |
Mike Jordan
|
|
|
FramingRob @ ###-####. Verified A35 attacments only.
|
GCB-Fndatn/slab ins/fld vent | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PART |
Mike Jordan
|
|
|
Foundation (Grout)Rob @ ###-####AM Inspection - 11 A.M. if possible. Cmu columns, top out. Work in progress. Special inspector on site.
|
GCB-Fndatn/slab ins/fld vent | 6/30/2011 | 7/1/2011 | 7/1/2011 | A | PART |
Mike Jordan
|
|
|
Foundation (Grouting)Rob @ ###-####Call in advance - AM Inspection. CMU wall, 8 to 12 ft. elevation. MTI on site.
|
GCB-Fndatn/slab ins/fld vent | 6/29/2011 | 6/30/2011 | 6/30/2011 | A | PART |
Dave Hannah
|
|
|
Foundation (Grouting)Rob @ ###-####Call in advance - 8 am inspection requested second lift on cmu grout mti spec inspector on site
|
GCB-Fndatn/slab ins/fld vent | 6/27/2011 | 6/28/2011 | 6/28/2011 | A | PART |
Dave Hannah
|
|
|
Foundation (Grouting?)Rob @ ###-####Call in advance - AM Inspection cmu spec inspector on site ok to grout
|
GCB-Framing | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Mike Jordan
|
|
|
FramingRob @ ###-####. Infill on exterior walls at existing building on 1st. and 2nd. floors ok.
|
GCB-Stem wall | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | PASS |
Dave Hannah
|
|
|
StemwallRob @ ###-####PM Inspection - Please sign card
|
GCB-Fndatn/slab ins/fld vent | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | PASS |
Dave Hannah
|
|
|
FoundationRob @ ###-####PM Inspection - Please Sign Card
|
GCB-Footing | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | PART |
Mike Jordan
|
|
|
FootingsRob @ ###-####PM Inspection Please - 1-2 p.m. Exterior permier footings and interior column pad footigns. Pending special inspections.
|
Plan assigned to (SRZ) | 3/31/2011 | 3/31/2011 | 5/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/12/2011 | | 5/12/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/12/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2011 | | 5/11/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/11/2011 | | 5/11/2011 | | PEND |
Sam Zahorka
|
|
|
Pending statement of special inspection application #310 signed by the Engineer of record.
|
1st review completed | | | 5/6/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 4/4/2011 | | 5/6/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 4/25/2011 | | DONE |
|
|
|
|
Case Summary (GCB) | | | 4/6/2011 | | DONE |
|
|
|
|
Routing - Mechanical Review | 4/1/2011 | | 4/4/2011 | | PASS |
Troy James
|
|
|
red noted plans
|
Routing - Plumbing Review | 3/31/2011 | | 4/1/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Application received | | | 3/29/2011 | | DONE |
|
|
|
|