Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberGCB11-00043
StatusFinaled
Name HC Company Inc.
Site Address 6720 GLENWOOD BLVD
Project NameBLD2011-00043
Customer Number 
ePlanReviewNo
Description
(Plantation Shopping Center) - To remodel the front facade of an existing shopping center per the approved plans. Work to include: Demolition work including removing existing roof tiles, CMU pilasters, and portions of the existing metal roof canopy; remove and replace the existing roof top units; remove and replace the existing built-up roof membrane with new PVC roofing membrane system over new rigid insulation board per plans; construct the new canopy upgrades per plans and engineering; construct new awnings in select locations; remove, relocate and replace select store front glazing and doors per plans; new exterior lighting upgrades; and exterior site upgrades per plans. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/19/20121/20/20121/20/2012APASS
DetailsDave Hannah
Darin @ ###-####Call 30 mins in advance for access
GCB-Fire Wall11/8/201111/9/201111/9/2011APASS
DetailsMike Jordan
Darin @ ###-####Call in advance. 5/8 type x at inside of canopy as per provided detail.
GCB-Energy10/26/201110/27/201110/27/2011APASS
DetailsMike Jordan
Darin @ ###-####Vapor Barrier. 2 layers of 15 lb. paper ok. at areas A, B and C.
GCB-Fire Wall10/17/201110/18/201110/18/2011APASS
DetailsDave Hannah
Darin @ ###-#### sheet rock in soffits ok
GCB-Framing10/17/201110/18/201110/18/2011APASS
DetailsDave Hannah
Darin @ ###-####
GCB-Energy10/6/201110/7/201110/10/2011ADONE
DetailsDave Hannah
Darin @ ###-####
GCB-Energy10/6/201110/7/201110/7/2011APASS
DetailsMike Jordan
Darin @ ###-####. 2 layers of 15lb. paper ok.
GCB-Framing10/4/201110/5/201110/5/2011APASS
DetailsMike Jordan
Darin @ ###-####. Framing area A ok.
GCB-Energy9/27/20119/28/20119/28/2011APASS
DetailsMike Jordan
Aaron Goff ###-####--Inspection is for a vapor barrier prior to stucco. AM please. Areas D and E. 2 layers of 15 lb. paper installed.
GCB-Framing9/26/20119/27/20119/27/2011APASS
DetailsDave Hannah
Darren@###-####
GCB-Framing9/21/20119/22/20119/22/2011APART
DetailsDave Hannah
Darin @ ###-####
GCB-Framing9/15/20119/16/20119/16/2011APASS
DetailsDave Hannah
Daron @ ###-####
GCB-Stem wall9/13/20119/14/20119/14/2011APASS
DetailsDave Hannah
Daron @ ###-####call in advance
GCB-Footing9/9/20119/12/20119/12/2011APART
DetailsMike Jordan
Darin @ ###-####Pouring around 8 a.m.. Cocnrete already placed. Special inspector was on site.
GCB-Framing9/6/20119/7/20119/7/2011APART
DetailsDave Hannah
###-####Call in advance ok to cover second section of awning
GCB-Framing9/1/20119/2/20119/2/2011APART
DetailsMike Jordan
Darin @ ###-####. Steel stud framing for new storefronts at area E and portion of area D. Aslo spoke with plan review regarding section IBC section 706.5.2 (horizontal projecting elements) for fire walls. Need to have fire walls located on plans and provide details for 1 hr. fire rated resistance construction were applicable.
Telephone call  9/2/2011 DONE
DetailsSam Zahorka
Contacted Jeff Likes the architect. Requested a plan to designate the Fire wall location and how the horizontal projections through the canopy area will be handled per the IBC. He is addressing this request and will email me a plan asap.
GCB-Fndatn/slab ins/fld vent8/22/20118/23/20118/23/2011APART
DetailsMike Jordan
Darin @ ###-####Call in advance. Work in progress on column stemwalls in area s B and C. WIll have special inspection.
GCB-Footing8/17/20118/18/20118/18/2011APART
DetailsDave Hannah
###-####Pouring at 11 amCall in advance first set of column pads ok spec will also inspect and test concrete
Telephone call  7/18/2011 DONE
DetailsSam Zahorka
Left message for Leon, No Misc. hours. for this project. This was a Level 2 T.I.
Plan assigned to (SRZ)6/6/20116/6/20117/15/2011 DONE
DetailsSam Zahorka
1st review completed. Pending Statement of Special Inspection and 2009 COMchecks.
Routing - PLAN CHECK7/15/2011 7/15/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/15/2011 DONE
DetailsSam Zahorka
Issue and Courier  7/15/2011 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK6/6/2011 7/5/2011 PEND
DetailsSam Zahorka
Issuance pending: Statement of special inspection application, 2009 COMcheck compliance certificates for exterior lighting and Mechanical.
1st review completed  7/5/2011 DONE
DetailsSam Zahorka
Application received  6/6/2011 DONE
DetailsBarbara Stitt