GCB-Final | 2/14/2012 | 2/15/2012 | 2/16/2012 | A | PASS |
Dave Hannah
|
|
|
Homeowner @ ###-####PM InspectionCall in advance still needs elec and plm finals
|
GCB-Energy | 11/21/2011 | 11/28/2011 | 11/28/2011 | A | PASS |
Dave Hannah
|
|
|
Chassidy @ ###-####PM Inspection - Call in advance
|
GCB-Energy | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | PART |
Dave Hannah
|
|
|
Chassidy @ ###-####PM Inspection - Call in advance seal package ok
|
GCB-Framing | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
GCB-Framing | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | CANC |
Mike Jordan
|
|
|
|
GCB-Framing | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | FAIL |
Mike Jordan
|
|
|
Steve @ ###-####. Needs to complete airseal package, provide truss engineering adn rough in smoke detectors and CO2 detectors as shown on approved plans. Correction notice was issued.
|
GCB-Footing | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Dave Hannah
|
|
|
FootinsHomeowner @ ###-####Call in advance this inspection was for the foundation
|
GCB-Footing | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | PASS |
Dave Hannah
|
|
|
FootingsSteve @ ###-####PM Inspection (4 p.m. preferred) - Call in advance
|
Plan assigned to (SRZ) | 7/1/2011 | 7/1/2011 | 7/7/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/1/2011 | | 7/7/2011 | | PASS |
Sam Zahorka
|
|
|
w/ red-line comments
|
1st review completed | | | 7/7/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 7/7/2011 | | DONE |
|
|
|
|
Application received | | 7/1/2011 | | | |
|
|
|
|