GCB-Final | 12/28/2011 | 12/29/2011 | 12/29/2011 | A | PASS |
Dave Hannah
|
|
|
contact Steve ###-####
|
GCB-Final | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | FAIL |
Mike Jordan
|
|
|
steve @ ###-####. Provide the required energy certificate and post. Correction notice was issued.
|
GCB-Framing | 10/7/2011 | 10/10/2011 | 10/10/2011 | A | PASS |
Mike Jordan
|
|
|
Steve @ ###-####. All issues are now resolved, ok to sheet rock.
|
GCB-Energy | 10/6/2011 | 10/7/2011 | 10/10/2011 | A | DONE |
Dave Hannah
|
|
|
steve @ ###-####
|
GCB-Framing | 10/6/2011 | 10/7/2011 | 10/10/2011 | A | DONE |
Dave Hannah
|
|
|
steve @ ###-####
|
GCB-Framing | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | CANC |
Mike Jordan
|
|
|
steve @ ###-####
|
GCB-Energy | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | PASS |
Mike Jordan
|
|
|
steve @ ###-####. Energy ok. Still needs to add the lateral bracing at top chords of trussues as noted on energy code.
|
GCB-Framing | 9/22/2011 | 9/23/2011 | 9/23/2011 | A | FAIL |
Mike Jordan
|
|
|
Steve ###-####. Provide additional lateral bracing on top chords of trusses A7A, A7,A8,A9,A10. Complete CS-PF over window. Correction notice posted. Ok to insulate.
|
GCB-Fndatn/slab ins/fld vent | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | PASS |
Mike Jordan
|
|
|
Shane @ ###-####PM Inspection
|
GCB-Footing | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Mike Jordan
|
|
|
Ryan @ ###-####Call in advance - PM Inspection. Perimeter footings ok.
|
GCB-Footing | 8/16/2011 | 8/17/2011 | 8/17/2011 | A | CANC |
Dave Hannah
|
|
|
Footings Ryan @ ###-####PM Inspection
|
GCB-Footing | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | NR |
Dave Hannah
|
|
|
FootingsRyan @ ###-####Late AM Inspection
|
Plan assigned to (SRZ) | 7/13/2011 | 7/13/2011 | 7/21/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/18/2011 | | 7/21/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2011 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 7/21/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 7/21/2011 | | DONE |
|
|
|
|
Routing - Mechanical Review | 7/13/2011 | | 7/18/2011 | | PASS |
Troy James
|
|
|
|
Application received | | | 7/11/2011 | | DONE |
|
|
|
|