Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB11-00061
StatusFinaled
Name Colony Homes, LLC
Site Address 10297 W CULTIS BAY
Project NameBLD2011-00061
Customer Number 
ePlanReviewNo
Description
To construct a new 1,800 square foot, one story, three bedroom, two bathroom, single family dwelling with a 500 square foot attached garage, a 65 square foot covered front porch, and a 165 square foot covered rear patio. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. FEMA Case No. 10-10-0983A **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/16/20123/19/20123/19/2012APASS
DetailsMike Jordan
John @ ###-####
Call for access. All issues resolved. Structural final ok. No card to sign. Could not verify other trades final.
GCB-Final3/13/20123/14/20123/14/2012AFAIL
DetailsMike Jordan
John @ ###-####Call for access. Provide the required energy cert. and post. provide blower door test results and post or the third party check list. Correction notice posted.
GCB-Energy11/17/201111/18/201111/18/2011APASS
DetailsMike Jordan
Steve @ ###-####Call in advance
GCB-Final11/2/201111/3/201111/3/2011APASS
DetailsMike Jordan
Steve @ ###-####. Check for fireblocking on energy code inspection at fireplace. ok to insulate.
GCB-Framing9/1/20119/2/20119/2/2011ACANC
DetailsMike Jordan
Shane @ ###-####PM Inspection.. Drove out to jobsite, no rough ins are completed. Called shane with colony himes, he noted that he did not need the inspection and to cancel. Charging time due to driving out to jobsite.
GCB-Fndatn/slab ins/fld vent8/16/20118/16/20118/16/2011APASS
DetailsDave Hannah
dane - ###-####
GCB-Footing8/11/20118/12/20118/12/2011APASS
DetailsTom Arcoraci
FootingsRyan @ ###-####Call in Advance - PM Inspection
GCB-Footing8/8/20118/8/20118/8/2011PCANC
DetailsMike Jordan
Job has been shut down as per conversation with Ryan.
GCB-Footing8/5/20118/8/20118/8/2011ACANC
DetailsMike Jordan
FootingsRyan @ ###-####Call in advance - PM Inspection. Moved to pm.
Plan assigned to (SRZ)7/13/20117/13/20117/21/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/20/2011 7/21/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/21/2011 DONE
DetailsSam Zahorka
1st review completed  7/21/2011 DONE
DetailsSam Zahorka
Issue and Courier  7/21/2011 DONE
Routing - Mechanical Review7/18/2011 7/20/2011 PASS
DetailsTroy James
Routing - Mechanical Review7/13/2011 7/18/2011 FAIL
DetailsTroy James
Application received  7/11/2011 DONE