GCB-Final | 1/11/2013 | 1/15/2013 | 1/15/2013 | A | PASS |
Jim Sly
|
|
|
Daniel ###-#### Call in advance Unable to determine if all other permits related to this project have been finaled. Structural final only....OK.
|
GCB-Framing | 5/29/2012 | 5/30/2012 | 5/30/2012 | A | PASS |
Mike Jordan
|
|
|
Daniel @ ###-####. All issues have been resolved. ok for cover.
|
GCB-Framing | 3/5/2012 | 3/6/2012 | 3/6/2012 | A | FAIL |
Mike Jordan
|
|
|
Daniel @ ###-####PM Inspection. Provie tempered glazing at tequired locations, provide fireblock at holes in top plates, Provide truss engineering or letter from engineer accepting in place work and provide treated bottom plates or paper on interior walls.
|
GCB-Footing | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Mike Jordan
|
|
|
Daniel Dowe ###-#### or ###-####--AM please.
|
Plan assigned to (SRZ) | 8/16/2011 | 8/16/2011 | 8/18/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/16/2011 | | 8/18/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2011 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 8/18/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 8/18/2011 | | DONE |
|
|
|
|
Application received | | 8/16/2011 | | | |
|
|
|
|